Plan: Applied Insurance Reference — Phase 5, Contract Module

Unit ID: applied-insurance-reference-phase-5 Epic: applied-insurance-reference Status: Deferred (epic D2). Starts after Phases 1 to 4 are wired into Open CBAA, and is detailed then, with ADR A-101. Sketch: term-parameters.md

Scope

A new contract module (the legacy one is dropped in Phase 1): terms, term parameters and term relations on Instrument, party roles and derived liability direction in common/, and the optional compiled route into Capacity with parity against the direct route.

Slices

Slice Content Sketch
AIR-5.1 ctr:TermParameter ⊑ ins:Qualifier, parameter kind scheme with governed admission (an unadmitted kind is carried but not evaluated) §3 (T3, T7), §4
AIR-5.2 limit, retention, defence cost, claims basis, waiting, indemnity and extended reporting parameters §4
AIR-5.3 aggregate, occurrence grouping, reinstatement, trigger, collateral, pool share, premium and declaration parameters §4
AIR-5.4 term relations and bundle shapes per term function §3 (T6), §4
AIR-5.5 party role parameters and direction derivation over roles and the exposure relationship graph, with the D&O example §7, milestone M4
AIR-5.6 defect catalogue as shapes §8
AIR-5.7 route R2: compile one check family into Capacity runtime forms, parity suite against R1, no write-back §5, milestone M5

5.7 needs L-P5 (substrate track S4) only if the chosen check family groups occurrences. The default candidate is bind-time authority, which does not.

Documentation deltas

Contract module README, ontology/applied/capacity/docs/architecture-overview.md (the compiled route and its parity contract), solution-design-specification.md (compilation is optional), docs/architecture/ontology-architecture.md §3.

Exit gate

M4 and M5 demonstrated. TP-Q3 answered.