Implementation Validation Status

Status: Accepted with recorded residuals Governing ADR: ADR-A29

Date: 2026-09-20
Implementation merge: ba04e5611efa39ec8d5cf753e854f5fa3e09d007
Validation baseline revision: 25bc56b050d5dc7853d37c09b03ab1cb2f989532

Purpose

This record tracks validation of the authoring-complete Phase 0 through Phase 6 implementation. Architecture documents describe intended behavior. This file records observed validation evidence and bounded blockers.

The handover’s new Phase 7 compiler and SPC work is out of scope until Phases 0 through 6 are validated and accepted.

Host Baseline

Stabilisation Controls

Evidence Log

Area Command Result Evidence or blocker
Baseline git rev-parse HEAD Recorded Current revision above; implementation merge confirmed in history.
Host tools executable and version inventory Blocked Canonical tool versions are not currently installed.
Worktree git status --short Recorded One pre-existing theory edit is outside this validation work and must not be reverted.

Status Vocabulary

Next Gate

  1. Install and validate mise.
  2. Install the pinned Java, Maven, Node, and Python versions through mise.
  3. Repair dependency locks before running repository-wide checks.
  4. Validate or move into the canonical Dev Container for Docker-backed integration.