Is a Peril Hierarchy Enough?

Structure, semantics and inter-layer cost of perils for the CBAA modules

Version 0.2, draft for review. Companion to the reference peril vocabulary, the asset exposure ontology, term parameters and the MORK bridge, which implement its recommendations. Cites Open CBAA’s design specification (AP, DP, D) and LATTICE integration specification (I, L), and LATTICE ADRs by number. Where this sketch and the applied insurance reference epic or its ADRs (A-98 to A-102) differ, they take precedence.


Summary

A hierarchy of perils is necessary and not sufficient. It is the right backbone for the most frequent CBAA question, “is this risk inside the perils the Coverholder may bind?”, and LATTICE’s hierarchical match with exclusions already answers that question for single-valued cases. It is not sufficient because the CBAA drafts, their reference lists and the London and US markets they sit in use “peril” for several different things at once, and because the meaning of a peril in a contract is partly fixed by the wording, the governing law and the location, not by the peril.

Eight further notions carry that meaning. Four belong in the vocabulary as SKOS-compatible structure: characteristics, collections, typed causal and overlap relations, and definition bases with links to Quantification. Four belong elsewhere and must not be forced into the vocabulary: contract-relative classification and definition (Open CBAA statements), causation rules (evaluation profiles by governing law), peril-by-location conditions (exposure units), and occurrence grouping (contract terms, with informative defaults). Three upstream changes to Eligibility serve the rest: reading a set of values (the risk’s several perils, a loss’s mechanisms), leaving undecided what a flat list cannot decide, and matching over kind links only. The first two are in LATTICE’s plan (ADR-A103, ADR-A100). The third does not block a first release.

The rich structure belongs to LATTICE’s applied insurance reference, not to Open CBAA. CBAA perils are defined by each agreement’s drafter or by the market, and arrive as flat lists or simple taxonomies far more often than as structured schemes. Open CBAA therefore binds the operative scheme it is given, checks at the level of structure that scheme has, and reaches the reference’s structure only through reviewed MORK crosswalks. Compilation of any of this into generated forms is optional and never the source of truth.

Recommendation Where Cost Needed for
cause hierarchy with kind and part links reference vocabulary low every scope check
characteristics: mechanism, agency, onset, definition basis, accumulation reference vocabulary low to author, moderate to govern cyber write-backs, flood by mechanism, pollution onset, accumulation
collections: bundles, model groupings, standard sets reference and market editions low SoUA standard exclusions, named-peril forms, model outputs
typed relations: triggers, overlaps reference vocabulary low secondary perils, classification checklists
Quantification links: intensity, thresholds, event windows reference vocabulary moderate threshold-defined perils, parametric triggers, hours clauses
peril definitions and classifications in wording Open CBAA statements moderate named storm, surge, write-backs
causation profiles by governing law Open CBAA, evaluation high mixed-cause losses, claims authority
exposure units (location × asset class × peril) asset exposure ontology moderate zone-dependent scopes, percentage deductibles, covenants
every-value and some-value readings LATTICE Eligibility high, upstream design-time classes for perils (I7), anti-concurrent exclusion
hierarchical match over flat lists, and set readings, both returning Undetermined rather than refusing LATTICE Eligibility and its compilers (ADR-A100, ADR-A103) moderate, upstream drafter and market lists that are flat or simply taxonomic, checks across several values
party roles for liability direction term parameters, LATTICE Party low D&O sides, insured against insured, parties unknown at binding

1. The Question

The integration specification leaves perils out of design-time classes because a risk has several (D24, I7), and the design specification’s catalogue lists peril as a hierarchical, runtime-critical dimension bound to a market edition (design-spec §4.5). Both treat the peril as one hierarchical dimension. This paper asks whether that is enough for the modules to operate, what else is needed, where each extra notion should live, and what each costs across Open CBAA’s modules and LATTICE’s layers.

“Enough” is judged against four evaluation modes (design-spec §6.3):

Mode Peril question
A, static admission is the risk inside the segment’s perils?
Q, quantitative is the sum insured inside the limit set for the peril’s segment?
P, portfolio do totals by peril stay inside GWP limits and accumulation appetites?
S, state does an active event (a named storm approaching) suspend authority?

and three design-time checks: materiality of an amendment that changes perils, overlap between segments, and completeness of the exposure data a peril needs.

2. What the CBAA Drafts Ask

The drafts reviewed are M1 to M14 and the M5 base tables. Every peril use found is listed.

# Draft Use Mode
U1 M5 SoUA base table, “Included Perils” optional per segment. The guidance says it is not a complete list, only the key perils that drive different sums insured or GWP limits, or single-peril cover A, Q, P
U2 M5 SoUA base table, “Excluded Perils” optional per segment, same guidance. More than one excluded peril may justify further segmentation A
U3 M5 SoUA “Perils List” tab the value list for U1 and U2: 525 codes from a market cause-of-loss list, headed “cause of loss, subclass of business”, flat all
U4 M5 SoUA “Standard Exclusions” war and war-related perils including civil war, nuclear, chemical, biological or radioactive perils, and financial guarantee, default, bankruptcy or insolvency risks. Default on every segment, removal marks the table non-standard A, materiality
U5 M5 SoUA cyber rows “losses caused by a Cyber event”, excluded or included per segment. “Cyber event” is a defined term A
U6 M5 SoUA “Applicable Pool Scheme(s)” per segment, from a list of national terrorism and flood pools A, P
U7 M5 insurable interest descriptors and segment names “direct physical loss or damage including the lesser perils of fire, extended coverage, vandalism and malicious mischief”, “excluding flood and earthquake”, “Property - Exc Wind, Flood” A
U8 M5 clause 5.15.1 where property is in France and cover includes fire or other damage, natural catastrophe cover must be offered under French regulation obligation
U9 M5 base tables, sum insured basis list “any one catastrophe”, “any one event”, “each and every loss or series of losses” Q, P
U10 M6 option D commission may vary across risks, locations, perils or segments remuneration
U11 M3 a natural catastrophe event or cyber attack can prevent the use of electronic means for amendments operational condition
U12 M8, M10 no peril terms in the drafts reviewed. Claims and bordereaux will carry cause of loss through the reporting data items, not reviewed here reporting

Two observations follow. First, the drafts use perils to segment authority (U1, U2, U10), so a peril scope names perils at whatever level a segment needs, and every level must be matchable. Second, the drafts attach other structure to perils: standard sets (U4), defined terms (U5), pools (U6), bundles and open grants (U7), territory-conditioned obligations (U8) and event grouping (U9). None of these is a parent-child relation.

3. What the Evidence Shows

3.1 The reference list mixes axes

The M5 “Perils List” (U3) is the list a CBAA drafter picks from. A sample of its 525 entries, grouped by what each entry actually names:

What the entry names Examples from the list
a natural cause earthquake, flood, hail, tornado, typhoon, storm, snow, surge, wind shear
a deliberate human act arson by a third person, burglary, robbery, assault and battery, extortionate robbery
an accident, often with its context accident hunting, accident on pasture, accident railway crossing, crash landing, collision on the ground
a defect or fault bad maintenance, bad workmanship, faulty material, latent defect, choice of wrong material
a failure mode engine failure, failure of hydraulic system, fuel exhaustion, material fatigue, machinery breakdown
a consequence delay, disappearance, shortage, partial loss, loss of freight, general average
a legal basis liability for buildings and premises, non-compliance regarding performance bonds
an injury or disease industrial deafness, byssinosis, poisoning by food
a specific product tort named pharmaceuticals and implants
no information “no details”

The heading itself says the list is two things (“cause of loss, subclass of business”). A hierarchy cannot be built over it without deciding, entry by entry, which axis the entry lives on, and many entries live on two (arson is a human act and a fire mechanism, “accident railway crossing” is a transport accident in a context). The reference vocabulary therefore does not adopt the list. It decomposes each code into a cause and characteristic values by a MORK mapping (peril vocabulary §9.2), so the list stays usable as input and never shapes the hierarchy.

3.2 A standard set that is not all perils

U4 excludes, by default, war (a conflict cause), nuclear, chemical, biological and radiological perils (a mix of accidental and deliberate causes, grouped by mechanism), and financial guarantee, default and insolvency risks. The last group is partly a cause (default, insolvency) and partly a class of business (financial guarantee), which the CBAA’s own insurable interest hierarchy lists under “Events and Intangibles, Contracts”. Represented as one node, the set would need a parent that means nothing. Represented as a collection spanning families and dimensions, it is exact, and “removal marks the table non-standard” becomes a comparison between a segment’s exclusions and the collection.

3.3 Model groupings cross branches and duplicate phenomena

Open catastrophe model codes group wind perils (tropical cyclone, extratropical cyclone, storm surge, hail, tornado, straight-line wind) and flood perils (fluvial, pluvial, coastal and surge) under group codes, including a “wind with surge” group. Storm surge appears on both sides, once as a wind sub-peril and once as coastal flood. Model outputs follow those groupings: one portfolio reports “hurricane, wind and surge combined”, “surge only” and “inland flood, non-surge” as three metrics. Any tree must put surge on one side, and every consumer that thinks of the other side then gets it wrong. Collections and overlap links carry the groupings without choosing.

3.4 Some perils exist by designation, some by threshold

A named windstorm is a storm a meteorological authority has named. Its extension is defined by an administrative act, not by physics, and it overlaps tropical cyclones and, in some regions, extratropical storms, without being a kind of either. A hurricane is a tropical cyclone above a sustained-wind threshold in particular basins. Some wordings define “storm” by a wind speed. “Cyber event” and “critical illness” are whatever the wording defines. A hierarchy records only that one class sits inside another. It cannot record what the membership test is, so a threshold-defined peril cannot be checked against an intensity, and a designation-defined one cannot be distinguished from a meteorological class with the same name.

3.5 Storm surge is classified by the wording

In the US worked example, the primary form’s water exclusion removes surge outside a named windstorm, and surge is covered only as part of named windstorm, with a percentage-of-value deductible. A 30 million surge loss at a 285 million location is a 14.25 million deductible as windstorm, or a 10 million sub-limit as flood. In the London example, flood sub-limits follow the model’s flood grouping. The same physical event is wind in one contract and water in the next. This is the clearest case against encoding classification in the vocabulary: the vocabulary should say surge is part of a cyclone event (a kind link would be wrong) and overlaps coastal flood, and the wording’s classification statement should decide.

3.6 Some peril scopes depend on where the risk is, not on the peril

The US example sub-limits flood differently inside and outside special flood hazard areas, and the lender covenant requires flood cover for properties in those areas and named windstorm cover for properties above a value. The London example sub-limits a territory. CBAA U8 obliges natural catastrophe cover in one country when fire cover is given. “Flood in a special flood hazard area” is not a narrower peril. It is a peril condition conjoined with a location condition (a regulatory zone designation), and the case the conjunction is evaluated on is a location and peril pair, not a policy.

3.7 One word on three axes

“Equipment breakdown” names a cause (mechanical or electrical failure), a coverage section (the London excess layers exclude “boiler and machinery”, the US programme covers it by a separate form) and a class of asset (boilers, pressure vessels, machinery). “Business interruption” is named as a peril in some models of cover, but it is a consequence of a cause. “Cargo” and “motor” name subjects and lines of business. A single hierarchy puts all three kinds of term in one tree, so an exclusion of the section would also exclude the cause wherever it occurs.

3.8 Causation differs between London and US

A loss often has more than one cause: a cyclone causes surge, a cyber attack causes a fire, a freeze causes a pipe to burst. Which cause governs cover is a question of law.

  London US
general rule proximate cause: the dominant, effective cause varies by state. Many apply an efficient proximate cause rule: the loss is covered if the efficient cause is covered
two concurrent causes, one excluded the exclusion generally prevails under efficient proximate cause, cover may follow the efficient cause. Wordings answer with anti-concurrent causation clauses, enforced in some states and not others
consequence evaluate the dominant cause, and deny if any concurrent cause is excluded evaluate the efficient cause, or deny if any cause is excluded where an anti-concurrent clause is enforceable

This is general background for design, to be confirmed by counsel before any rule is encoded. The design consequence does not depend on the detail: the rule that picks the governing cause is set by governing law and wording, so it is an evaluation profile selected per contract, and a loss record must keep the chain of causes, not one code.

3.9 Cyber is split by intent and written back by mechanism

The London layers use two cyber clauses: one excludes malicious cyber acts and writes back non-malicious events that cause physical damage, the other excludes all cyber absolutely. The write-back scope is a closed list of physical damage mechanisms (fire, explosion). The US primary has an absolute cyber physical damage exclusion. To evaluate these, a loss needs its agency (malicious or not) and its mechanism (what did the physical damage), and the vocabulary needs both as characteristics. A tree of “cyber” concepts alone cannot express “non-malicious and resulting in fire”.

3.10 Named-peril bundles are sets

CBAA U7 names “the lesser perils of fire, extended coverage, vandalism and malicious mischief”. US causes-of-loss forms come in named-peril variants (a basic list and a broad list) and an open variant with exclusions. Bundles are sets of perils from several families, varying by market and form edition. They are collections, never nodes, and the open variant is not a bundle at all but “everything in the edition, minus exclusions”.

3.11 Occurrences are grouped by peril

Hours clauses group losses into one occurrence within a window that depends on the peril, and the US example applies a 72-hour windstorm deductible per location. U9’s “any one catastrophe” and “any one event” bases, and the US named storm aggregate that decides when a higher layer attaches, both depend on grouping losses into events. The window is a contract term, but its customary values differ by peril, and an event record needs the peril to know which window to apply.

3.12 Pools and residual markets are linked to perils and places

CBAA U6 lists terrorism and flood pools. The US example uses state residual wind pools and a national flood scheme that sits primary to the programme. Each pool covers a peril set in a territory. They are neither perils nor territories, and their link to both is structure the vocabulary should carry (peril vocabulary §9.4).

4. Where a Hierarchy Alone Fails

# Failure Consequence in CBAA Evidence
F1 one tree for several axes (cause, consequence, subject, line) an exclusion of a section excludes the cause everywhere, and a segment scoped by line admits unrelated causes §3.1, §3.7
F2 forced single placement of overlapping phenomena surge admitted under a wind segment and denied under a flood segment, or the reverse, against the wording §3.3, §3.5
F3 polyhierarchy used to escape F2 sibling disjointness can no longer be declared (ADR-A90 refuses it for polyhierarchies), so overlap checks between segments over-report §3.3
F4 bundles and standard sets as nodes “non-standard” detection impossible, open grants unrepresentable §3.2, §3.10
F5 membership tests not recorded a threshold or designation peril cannot be checked against event data or a parametric trigger §3.4
F6 classification fixed globally the vocabulary contradicts wordings, and no single edition can serve London and US §3.5
F7 peril scope without location conditions zone-dependent sub-limits and covenants unevaluable §3.6
F8 one peril per loss cyber write-backs, anti-concurrent clauses and proximate cause rules unevaluable §3.8, §3.9

F1 to F5 are vocabulary structure. F6 to F8 are not, and fixing them in the vocabulary would make it worse.

5. Structural Notions

Each notion: what it is, why CBAA needs it, the ways it could be expressed, and the choice.

# Notion Need Options Choice
N1 Kind and part links hurricane deductibles on kinds, model totals on parts (§3.3) two SKOS schemes, OWL classes, the thesaurus standard’s generic and partitive broader sub-properties of skos:broader, aligned to iso-thes:, with skos:broader materialised
N2 Characteristics cyber write-backs, flood by mechanism, onset for pollution, accumulation (§3.9) polyhierarchy, one scheme per characteristic, OWL class conjunctions one scheme per characteristic, characteristic properties on concepts for defaults and on occurrences for facts
N3 Collections standard exclusions, bundles, model groupings (§3.2, §3.10) nodes, skos:Collection, SHACL lists skos:Collection sub-classes, expanded at bind time
N4 Triggering secondary perils across families (§3.8) skos:related, a new property prl:canTrigger ⊑ skos:semanticRelation, directed (skos:related is symmetric)
N5 Overlap extensions that intersect without subsumption (§3.3, §3.4) nothing, polyhierarchy, a new property prl:overlaps ⊑ skos:related, symmetric, and a shape that asks the wording to resolve each overlap in scope
N6 Definition basis and thresholds designation and threshold perils (§3.4) prose, a characteristic, Quantification links a characteristic, plus prl:definingThreshold to a qnt:RangeSet on an intensity space
N7 Occurrence grouping hours clauses, event-based bases and aggregates (§3.11) vocabulary, contract terms, Behaviour a contract term. The vocabulary carries only an informative customary window
N8 Peril by place zone sub-limits, covenants, U8 (§3.6) narrower perils per zone, conditions over a case Eligibility conjunction over an exposure unit (location × asset class × peril)
N9 Contract-relative meaning surge classification, named storm definition, write-backs (§3.5) vocabulary editions per contract, statements stm:Definition, stm:Classification, stm:Precedence on the wording
N10 Causation rules mixed-cause losses (§3.8) fixed rule, statement, evaluation profile an evaluation profile selected by governing law, overridden by a precedence statement where the wording has an anti-concurrent clause
N11 Pools U6, residual markets (§3.12) territory concepts, peril concepts, own scheme own scheme linked to perils and territories
N12 Sets of values a risk covers several perils, a loss has several causes (§3.8, I7) one case per peril, quantified readings exposure units where the data allows, upstream every-value and some-value readings otherwise
N13 Market editions and decomposition London and US framings, the flat list (§3.1) fork, override editions, decomposition mappings override editions bound by market and regime, flat lists decomposed by MORK mapping
N14 Active hazard events US binders commonly suspend binding while a named storm threatens (general practice, not in the drafts) a peril property, a Behaviour state a Behaviour trigger from an external advisory, with an Eligibility guard on the risk’s territory (mode S)
N15 Liability direction liability, D&O and E&O segments scoped by who harmed whom, with claimants unknown at binding agency characteristic, harm subject, party roles party roles (harmed, liable, claimant, payee) with occupancies that may be unfilled, direction derived from them (term parameters §7). Agency stays a cause characteristic
N16 Scheme structure drafter and market lists range from flat to structured require the reference structure, degrade silently, profile each scheme no profile. Eligibility leaves codes a flat list cannot decide Undetermined (ADR-A100), and characteristics a list lacks are missing evidence, also Undetermined. Reviewed crosswalks lift exactly mapped codes to the reference (MORK bridge §3)

6. Where Each Notion Lives

flowchart LR
    subgraph Vocab["Reference peril vocabulary (LATTICE applied insurance)"]
        N1["N1 kind and part"] --- N2["N2 characteristics"] --- N3["N3 collections"]
        N4["N4 triggers"] --- N5["N5 overlaps"] --- N6["N6 definition basis"]
        N11["N11 pools"] --- N13["N13 editions, crosswalks"]
    end
    subgraph Stm["Open CBAA statements and agreements"]
        N9["N9 definitions, classifications"] --- N10["N10 causation profiles"] --- N7["N7 occurrence grouping terms"]
        OP["operative scheme: drafter or market"]
    end
    subgraph Tp["Term parameters"]
        N15["N15 party roles, liability direction"]
    end
    subgraph Aeo["Asset exposure ontology"]
        N8["N8 exposure units, zones"] --- LR["loss cause chains"]
    end
    subgraph Lattice["LATTICE substrate"]
        E["Eligibility: hierarchical match, exclusions"] --- Q["Quantification: thresholds, windows"]
        N16["N16 flat lists and missing evidence: Undetermined"] --- E
        B["Behaviour: advisory triggers (N14)"] --- S["Surface: generated classes"]
        M["MORK: decomposition mappings"] --- V["Vocabulary: editions, scoped bindings"]
    end
    Vocab --> V
    N6 --> Q
    N9 --> E
    N8 --> E
    N13 --> M
    OP -- "reviewed crosswalk" --> M
    OP -- "evaluated" --> N16
    N15 --> P["Party: roles, occupancies"]

Three properties, one contract. The CBAA uses three different peril relations, and today Open CBAA has one property (rsk:peril):

Relation Property Owner
perils a policy or risk covers rsk:peril (renamed in meaning to “covered peril”) Open CBAA risk
perils an exposure is subject to aeo:unitPeril, aeo:perilScope asset exposure ontology
perils that caused a loss aeo:peril on each aeo:LossCause of a loss’s cause chain and, for CBAA claims, a claims module property exposure and claims

All three name the same scheme contract, so one binding serves them, and none is mistaken for another.

7. Inter-Layer Dependencies and Cost

7.1 By notion

Notion Open CBAA artefacts LATTICE layers Upstream change Reasoning and runtime cost Governance and data cost
N1 peril vocab, rsk:PerilContract binding Vocabulary, Eligibility (reads skos:broader+) none for a first release. L-P2 for kind-only matching closure of about 240 concepts at depth 5 or less is under 1,000 pairs per edition, materialised or interval-encoded (design-spec §4.4) every concept states its link kind
N2 statement scope parameters for mechanism and agency, reading the reference’s characteristic schemes Vocabulary, Eligibility none one extra condition per scope that uses a characteristic, on a single-valued path from a loss three mandatory characteristics per concept at authoring (LATTICE). Loss records must capture them, so claims data items must carry them
N3 peril collections, SoUA standard exclusions Vocabulary, Eligibility none: bind-time expansion none at runtime, since expansion happens at bind collections per market edition, with review
N4, N5 peril vocab, shapes Vocabulary none shape evaluation at bind curation of each link. The overlap shape creates review work, which is its purpose
N6 peril vocab intensity scheme Quantification none: value spaces, range sets and alternative bounds exist threshold checks are interval containment (mode Q) intensity spaces and units per measure
N7 statement parameters for event windows, agreement terms Quantification (durations), Behaviour or Capacity (grouping) L-P5, episode grouping by anchored window grouping is stateful: an accumulator per open event loss events must be recorded with times and perils
N8 rsk:Risk alignment, SoUA segment scopes Eligibility (conjunction on one subject class) none if the exposure unit is the case one unit per location, class and peril in scope: a portfolio of 10,000 locations and 6 perils is 60,000 units, generated zone designations per jurisdiction, spatial joins as derived artefacts
N9 stm:Definition, stm:Classification, stm:Precedence patterns for perils Instrument (via statements), Eligibility none classification rewrites a loss’s peril before scope evaluation, one lookup per loss extraction and review per wording (design-spec §3.7)
N10 agreement or policy governing law, causation profiles Eligibility (profile aggregation) L-P3: exclusion on any member of a set depends on the profile: dominant cause is a single-valued path, anti-concurrent is a some-value reading over the chain legal review of each profile, per jurisdiction
N11 pool scheme, SoUA pool row, exposure pool participation Vocabulary none none pool editions per territory
N12 risk, exposure units Eligibility, Surface L-P3 (I7) design-time OWL classes for multi-valued perils need quantified readings: a some-value reading is ∃peril.Within(c), cheap. An every-value reading is ∀peril.Within(c) ⊓ ∃peril.⊤. Both are small for a reasoner at this vocabulary size, so the cost is the upstream change to the shared IR, not reasoning none beyond I7
N13 market editions, crosswalk mapping graphs Vocabulary (scoped bindings), MORK none: scoped bindings exist (L3a) resolution by scope precedence, per bind the largest ongoing cost: each market edition and each external list needs a maintained crosswalk, reviewed by people
N14 agreement lifecycle, advisory events Behaviour, Eligibility none a trigger per advisory, a guard per bind an advisory feed, out of scope for the ontology
N15 segment scopes on direction, party role parameters Party, Instrument, Eligibility none: roles and unfilled occupancies exist one derivation per claim, from the relationship graph relationship data (subsidiaries, contracting chains) must be captured for fourth-party checks
N16 crosswalks, bound drafter lists Eligibility, Foundation, MORK for proposals L-P7 none: the compiler already resolves the scheme one reviewed crosswalk per list edition

7.2 Upstream changes

# Layer Change Motivating need Status
L-P1 Vocabulary concept-level lifecycle: deprecation, replacement and split across editions splitting or retiring a peril without breaking recorded values already an open item in Vocabulary
L-P2 Eligibility HierarchicalMatch with a chosen traversal: all broader links, or a named sub-property of skos:broader only a hurricane deductible applies to kinds of tropical cyclone, not to its parts new
L-P3 Eligibility every-value and some-value readings for evidence bindings, and an exclusion that denies when any value is excluded several perils on a risk (I7), anti-concurrent causation over a loss’s causes, checks across cause and characteristics ADR-A103, Phase 3
L-P4 Surface generated classes from collections and characteristic conjunctions design-time checks over bundles and write-back scopes new
L-P5 Quantification or Capacity grouping of occurrences into episodes by a window anchored on the first occurrence hours clauses, event-based aggregates new. Capacity (applied) first, per its promotion criteria
L-P6 none, guidance spatial pattern: geometry by GeoSPARQL alignment, zones as concepts, joins as derived artefacts zone-dependent scopes new
L-P7 Eligibility hierarchical match over a scheme without a hierarchy leaves unnamed members Undetermined, with a diagnostic a flat list bound under hierarchical match is silently read as refusing every candidate it does not name (N16) ADR-A100, Phase 3

Each substrate change follows the clean-room procedure (ADR-A-C2): a domain-neutral premise and two non-insurance examples before any mechanism prose. The premises exist without insurance: kind against part-of matching (anatomy, organisational units), set readings (a patient’s several diagnoses, an applicant’s several qualifications), episode grouping (clinical episodes of care, incident grouping in operations), hierarchical match over a flat list (a lender’s sector codes against an industry classification, an employer’s job titles against an occupational classification).

7.3 The cost of not doing it

If omitted What goes wrong
characteristics cyber write-backs and flood-by-mechanism wordings cannot be checked, so every such bind refers
collections standard exclusions are copied per segment, and removal is undetectable
overlaps and classification statements surge and similar losses are decided by whichever side the vocabulary chose, silently
causation profiles mixed-cause losses (the costly ones) are decided by the first code on the claim
exposure units zone-dependent scopes and covenants are checked by hand
editions and crosswalks a London binder writing US risks gets London framings for US forms
Undetermined over flat lists a flat list is either rejected or silently treated as structured, and checks that need structure it lacks return wrong answers instead of Undetermined
party roles D&O Side A, B and C and insured-against-insured exclusions are unevaluable, and a claim by an unknown fourth party cannot be placed

7.4 Optional compilation

Every check runs directly over the source graph (route R1, term parameters §5). Surface projections, generated classes and capacity runtime profiles are allowed where profiling shows a need, as cached reproducible artefacts with parity tests against R1. There is no synchronisation back from a compiled form to its source. The cost of compilation is therefore opt-in per deployment, and its absence costs latency, not correctness.

8. London and US: What the Differences Change

Difference Vocabulary Asset exposure Open CBAA LATTICE
open perils with sub-limits (London) against causes-of-loss forms (US) bundles and open grants as collections and exclusions, per market edition none segment scopes read either form none
named windstorm by designation (US) designation-defined concept, overlapping both cyclone families none wording defines the designation authority and window none
surge classified by wording (US) part of cyclone event, overlaps coastal flood loss records keep initiating and proximate cause classification statement per wording none
flood by regulatory zone (US) zone is not a peril zone designations, exposure units segment scopes conjoin peril and zone none, if units are cases
percentage-of-value deductibles per location (US) none location values by value type deductible terms read the unit’s value Quantification derived rates (done)
peril-specific aggregates across layers (US) none peril metrics include event frequency accumulators per peril grouping L-P5
cyber malicious and non-malicious (London) agency split, mechanism characteristic loss agency and mechanism write-back as classification plus scope L-P4 for design-time checks
causation by governing law chains are possible, not asserted loss chains governing law on agreement and policy, causation profiles L-P3
lender covenants by peril and zone (US) none requirements with obligee not a CBAA concern, but the same data Instrument obligation (done)
residual markets and pools pool scheme pool participation SoUA pool row none
board appetite by return period (London) none requirements on peril metrics none Quantification derived rates (done)

A CBAA binder is written in London, but its risks may be US risks written as surplus lines. Both framings can apply to one agreement, which is why market editions are bound by market and regime scopes together (peril vocabulary §9.1), and why the exposure ontology keeps its core market-neutral.

9. Proposed Decisions

For Open CBAA, to be added to the design specification’s decision log once agreed:

# Decision
D27 The reference peril vocabulary is LATTICE’s (applied insurance peril/). Open CBAA binds it only as the unscoped fallback of rsk:PerilContract. Agreement, drafter and market editions (an LMA view included) are bound by scope and take precedence
D28 Keep the peril vocabulary to causes. Consequences, harm subjects, liability bases and lines of business are other schemes
D29 Three peril relations (covered, exposed, caused) under one contract (§6)
D30 SoUA standard exclusions as a standard set collection, compared at bind to flag non-standard tables
D31 A pool scheme, linked to perils and territories, for the SoUA pool row
D32 Peril definitions, classifications and write-backs in wording as statements, with an overlap shape asking for them
D33 Governing law on agreement and policy, selecting a causation profile, pending legal review
D34 Exposure units as the case for zone-dependent and location-dependent peril scopes
D35 Drafter and market lists are bound as they are. Checks against them return Undetermined with a diagnostic where the list cannot decide (LATTICE ADR-A100), and reviewed crosswalks lift exactly mapped codes to the reference
D36 Compilation is optional. The source graph is normative, compiled forms are parity-tested caches, and nothing synchronises back
D37 Liability direction is derived from party roles, never recorded as a peril or characteristic

10. Phasing

Phase Scope Depends on
1 LATTICE: hierarchical match over flat lists (L-P7) and set readings (L-P3), cause hierarchy with kind and part links, collections, reference codes. Open CBAA: binding of drafter and market lists. Crosswalk of the CBAA list nothing
2 characteristic schemes, party roles for liability direction, triggers and overlaps, overlap shape, classification and definition statement patterns phase 1
3 intensity scheme and thresholds, pool scheme, exposure units in the asset exposure ontology phase 2, Quantification (done)
4 causation profiles, loss cause chains in claims legal review, L-P3
5 design-time classes from collections and characteristics, episode grouping L-P4, L-P5

11. Open Questions

# Question
W-Q1 Resolved: LATTICE owns the reference vocabulary, in applied insurance peril/ (D27)
W-Q2 Which causation profiles are needed first, and who reviews them?
W-Q3 Do the CBAA reporting data items carry cause of loss, and at what granularity? The answer sets how much of the characteristic structure claims data can populate