LATTICE Developer Coordination Index

Last updated: 2026-09-25 — ADR-A97 makes MORK OWL 2 DL (Mork 0.4.0). ADR-A83 reasoning harness delivered (eligibility-compiler Part B). applied-ontology-readiness AOR-10, AOR-11 and AOR-14 to AOR-17 implemented, ADRs A-83, A-86, A-93 to A-96 accepted. documentation-link-repair planned
Purpose: Single source of truth for all active units of work: sketches, plans, status, reviews, and validation packs.
Format: By unit identifier, with links to all related documents and current status.


How to read this index

Each work unit has:

Navigation: Use Ctrl/Cmd+F to search by topic (e.g., “RDF”, “MTP”, “housekeeping”) or by unit ID.


Part I — Completed Work

Persistence and IRI patterns: the change package at a glance

Is it complete? Almost. The documentation is complete and every review is closed. The compiler is five slices into a six-slice re-sync, and the sixth (documentation close-out) is in progress this session. Housekeeping has not started, and the identity decisions await ratification. Row by row (as of 2026-09-25):

Unit State Remaining Blocked on
rdf-sparql-patterns-phase Slices 1–2 (guide, ontology/persistence, tools/persistence) ✅ Complete — —
rdf-sparql-patterns-remediation (first review of the guide) ✅ Complete, closed nothing; deferred items handed to the units below —
iri-patterns-post-3866b21-remediation (second review, plus template alignment) ✅ Complete, closed nothing; follow-ons listed in its status —
persistence-compiler-iri-sync (compiler catches up with the vocabulary) ✅ Slices 1–5 done (Slice 5 human-validated 2026-09-25, 774 passed) Slice 6 close-out, in progress. Gap table in its status —
rdf-sparql-patterns-phase Slice 3 / platform-housekeeping ⏳ Not started the whole slice, including the retention and audit changes noted in its plan —
P0.1.3: ADR-A82 and iri-identity-patterns.md 📝 Drafted and revised, Proposed human ratification, and the point 5 amendment proposed by identity-minting Phase 0 ratification pass
identity-minting (minting recipes, conformance vectors, standalone Java and Python libraries, dal:claimsConstraint) 🚧 M0–M3 of M0–M4 done: plan, status M4 specification and human walk-through. One open question: default-ignorables in the upper- and lowercase pipelines —
toolchain-jdk25-python314 (JDK 25 LTS, Python 3.14, Unicode 16.0) ✅ Complete: plan, status — —
identity-minting-shared-core (one Rust minting engine, WebAssembly-hosted in each runtime) 🅿️ Sketch, deferred persistence-compiler-iri-sync is now complete (2026-09-25); this sketch can be revisited. M2 and M3 proceed with native libraries meanwhile none — the thing it was waiting on is done

1. RDF/SPARQL Implementation Patterns and Persistence Compiler

Field Value
Status ✅ Slices 1 and 2 complete; compiler re-sync with the extended vocabulary in progress (unit 1a); Slice 3 not started
Unit ID rdf-sparql-patterns-phase
Sketch persistence-profile-substrate.md
Plan rdf-sparql-patterns-phase-plan.md
Status Record rdf-sparql-patterns-status.md
Architecture Guide docs/architecture/rdf-sparql-patterns-guide.md (Slice 1)
ADRs ADR-A78 (persistence substrate), ADR-A79 (compiler), ADR-A80 (housekeeping) — all Accepted
Implementation ontology/persistence (Turtle vocabulary + SHACL shapes + 22 example fixtures, extended 2026-09-23), tools/persistence (Python compiler, 570 tests passing; privacy and claim-scheme profiles not yet wired, see unit 1a)
Validation Pack persistence-substrate-and-compiler.md
Sync gap See unit 1a below
Earlier review rdf-sparql-patterns-remediation: plan, status — ✅ complete, closed

Slice Completion Status

| Slice | Deliverable | Status | |——-|————|——–| | 1 | rdf-sparql-patterns-guide.md — consolidated 4 source notes into authoritative reference (30 chapters covering K/O/C/T/QP patterns) | ✅ Complete | | 2 | ontology/persistence + tools/persistence compiler + policy enforcement + doc deltas | ✅ Complete | | 3 | platform/housekeeping module (scaffolding, not execution) | 🚧 Planned, not started |

Key Findings

Blocks

Epic decomposition into phase plans is no longer blocked: the required Phase 2 (P2.1/P2.3/P2.4) revision integrating this compiler is complete — see Part II, §6.

1a. Persistence Compiler / IRI-Patterns Sync (new, tracks the 2026-09-23 gap)

Field Value
Status ✅ Slices 1–5 complete (Slice 5 human-validated 2026-09-25: 774 passed). 🚧 Slice 6 (documentation close-out) in progress
Unit ID persistence-compiler-iri-sync
Sketch (gap analysis) persistence-compiler-iri-sync.md
Plan persistence-compiler-iri-sync.md
Status Record persistence-compiler-iri-sync.md
Validation Packs Slice 1, Slice 2, Slice 3, Slice 4, Slice 5
Triggering commit c276afb “[iri-patterns] remediate docs and update persistence ontology vocabulary”

Gap summary

Three new profile dimensions (dal:IdentityProfile, dal:EpochProfile, dal:PrivacyProfile), extensions to six existing ones, and eight new SHACL shapes were added to ontology/persistence, none consumed by tools/persistence. One finding (G1) is a live correctness issue, not just missing coverage: the compiler’s CAS/tombstone templates generate the epoch-guard shape the vocabulary now documents as unsafe (dal:RowLevelGuardOnly), unconditionally, with no way to configure the safe dal:DatasetLevelGuard alternative.

Slices

  1. ✅ Complete, 290/290 passing. Dataset-level epoch guard — dal:epochGuardScope resolvable, dal:DatasetLevelGuard template variant for the three named write shapes, warning diagnostic fires even on the platform baseline default. See the VP.
  2. ✅ Complete, 526/526 passing. Extension properties resolved one dimension each, baseline defaults, two refusals and six warnings mirroring the SHACL shapes, dal:PreCreatedRow emits bootstrap-version-row, request-time values as Mustache slots. See the VP.
  3. ✅ Complete, 570/570 passing. Identity resolved per resource role (identity:<Role>), winning profile node as a unit, emitted to the compiled profile, five refusals and one warning. See the VP.
  4. ✅ Complete, human-validated 2026-09-25 (669 passed, adversarial probes checked). Privacy/erasure profile (dal:privacyClass/dal:erasureStrategy/dal:erasurePrecedence/dal:perSubjectScoped, one dimension each) plus the G3 remainder (dal:epochAuthority promoted to its own dimension, carrying the remaining restore-surface properties as its extras), two refusals mirroring dal:PersonalDataRequiresErasureShape and dal:PersonalDataReceiptCompatibilityShape, and Worked example 4’s privacy profile now resolving and emitting cleanly. See the VP.
  5. ✅ Complete, human-validated 2026-09-25 (774 passed). Uniqueness dal:onViolation selects a reconciler operation, never the guarded write itself (decision 1, Option A — guide §7.5, not §6): key-claim-duplicate-audit (dal:Reject, the default), key-claim-merge-rewrite (dal:Merge, with MergeRelationRequired), key-claim-quarantine (dal:Quarantine). dal:ClaimScheme dal:Dual rotation selects key-claim-write-dual.mustache. The registry-token digest-scheme relaxation (found in identity-minting M3) is also folded in: dal:DigestSchemeRequiredShape now exempts dal:PositionDerivedEvent + dal:RegistryTokenDerivation only. ontology/persistence bumped PATCH, 0.2.0 → 0.2.1. One issue found by the run itself, fixed: a mustache-comment quoted its own tag syntax as prose, which this compiler’s renderer does not treat as inert. See the VP.
  6. 🚧 Documentation close-out, in progress this session

1b. IRI and RDF Patterns, Post-3866b21 Remediation

Field Value
Status ✅ Documentation remediation complete, and tools/persistence templates aligned (2026-09-23), 471/471 tests passing
Unit ID iri-patterns-post-3866b21-remediation
Review iri-patterns-post-3866b21-review.md
Status Record iri-patterns-post-3866b21-remediation.md
Documents rdf-sparql-patterns-guide.md (Appendix D.3), iri-identity-patterns.md, iri-policy.md (body removed)

All 7 critical (A), 14 major (B), 9 safety (C), 7 cross-document (D) and 10 editorial (E) findings are fixed in the documents. The main design choices (lazy epoch rebase, request digest, pinned heads, row-driven gap audit, NFKC_Casefold) are recorded once in the status record. The compiler templates now generate the corrected write shapes and audits. A pre-existing bug that wrote key claims into the txn graph is fixed.


2. LLM Training and MORK Teaching Pack (MTP) Generation

Field Value
Status ✅ Complete and production-ready
Unit ID llm-training-mtp
Sketch llm-training.md, MTP L2 Generator Sketch.md
Plan mtp-implementation-plan.md → mtp-execution.md
Status Record llm-training-mtp.md, mtp-execution.md
Implementation tools/mork/src/mtp/ (Python package)
Tests 346 tests passing under mise run check:mtp
Deliverables L0-L5 curriculum: 258 terms, 895 axioms, 9 lenses, 30+ cassettes, 20 output files

Completion Status

Blocks


3. Repository Topology and Documentation Governance

Field Value
Status ✅ Accepted (ADR-A77)
Unit ID repository-topology-a77
Status Record repository-topology-a77.md
ADR ADR-A77
Implementation Relocation of semantic assets to ontology/, tools to tools/, restructuring of docs/developer/
Doc Reference .github/copilot-instructions.md — “Repository Topology and Documentation Governance” section

Deliverables


4. MORK Eligibility Compiler

Field Value
Status 🚧 A1, A3, A4 covered by check:mork-compilers. Part B delivered and A2’s reasoner half passes after ADR-A97’s Mork repairs. A5 verified for builtin-free rules (2026-09-25, VP)
Unit ID eligibility-compiler
Plan eligibility-compiler.md — verification (Part A) + shared test-only reasoning/rules-engine infrastructure (Part B)
Status Record eligibility-compiler.md
Implementation tools/mork_compilers/ — SPARQL, SHACL, SWRL, and the design-time OWL backend (ADR-A90). platform/reasoning-testkit (ADR-A83), test-only
Coverage IntervalCondition only (other condition types deferred); positive-only per ADR-A24
Tests Unit tests present; need runtime validation. SPARQL (rdflib) and SHACL (pyshacl) validation need no new dependency; SWRL/OWL-reasoner validation is gated on Part B’s new shared test-only module

Deliberate Non-Coverage

Blocks


5. Governance Surfaces (MORK Review Workbench, Surface Studio)

Field Value
Status 🟡 Skeleton UI complete; backend integration pending
Unit ID governance-surfaces-integration
Sketch governance-and-versioning-migration.md
Status Record governance-surfaces.md
Plan governance-surfaces-integration.md
Implementation apps/mork-review-workbench/, apps/surface-contract-studio/ (Vite + React)

Deliverables

Remaining Work (3 slices per plan)

  1. Phase 2 Slice: Studio backend wiring (MORK mapping integration)
  2. Phase 5 Slice: Bench permission model + enforcement
  3. Phase 5 Slice: Evidence projection state

Part II — Active/Planned Work

6. Epic Decomposition: Lattice Platform Agentic Development

Field Value
Status ✅ Decomposed into 5 phase chunks (2026-09-22). Phase 0 ready to execute, pending one pre-execution decision (below)
Unit ID lattice-platform-development (epic)
Plan lattice-platform-agentic-development-v0.2.md
Description Decomposed into Phase 0-4 plans with dependency DAG and milestones
Blockers See “Pre-execution decision points” under Phase 0 below

Scope

Required Epic Plan Revision — ✅ Done (2026-09-22)

Part 6 (Phase 2) of the epic plan now integrates the persistence compiler instead of constructing SPARQL ad hoc:

See rdf-sparql-patterns-phase-plan.md and persistence-profile-substrate.md for the underlying substrate; no new ADR was needed (refinement of ADR-A78/A79 within existing guardrail G5).

Optional Phase 0.2–0.4 Integration — ✅ Done (2026-09-22)

Per COORDINATION_REORG_HANDOFF.md, Phase 0 of the epic plan (Part 4) now carries a “Persistence-pattern coherence” note plus cross-references so its vocabulary is dal:-nameable from day one, without Phase 0 depending on tools/persistence:

Epic Decomposition — ✅ Done (2026-09-22)

Phase Plan Status Sketch Depth
0 — Decisions and foundations phase-0-plan.md phase-0-status.md phase-0-sketch.md Full slice detail (epic Part 4, referenced not duplicated)
1 — Graph-primary core and deployment plane phase-1-plan.md phase-1-status.md phase-1-sketch.md Full slice detail (epic Part 5)
2 — Ingestion and query planes phase-2-plan.md phase-2-status.md phase-2-sketch.md Rolling-wave placeholder, expands at P1.11.3
3 — Operation plane phase-3-plan.md phase-3-status.md phase-3-sketch.md Rolling-wave placeholder, expands at P2.11.4
4 — Maturity phase-4-plan.md phase-4-status.md phase-4-sketch.md Placeholder, sized after Phase 3 measurement

Each phase plan adds three obligations the epic’s slice tables name but never tabulate: a docs/architecture deliverables table, a subproject-README table, and a solution-design-specification.md delta table (which SDS section changes, and at which slice).

Three mechanical corrections made to the epic during decomposition (not architectural decisions — corrections against already-established convention): deploy/ → deployment/ (root already exists under that name), make/just → mise tasks (copilot-instructions mandates mise as sole orchestrator, ADR-A29 not superseded), docs/adr/ → docs/architecture/decisions/.

Pre-execution decision points surfaced, not resolved (see phase-0-plan.md §2):

No code was written and no new Phase 0→Phase 2 dependency was introduced — this is cross-referencing and one new documentation-only slice.

IRI and Identity Patterns — Proposed (2026-09-23)

The unratified universal IRI policy in ADR-A51 was superseded by ADR-A82. The new IRI and Identity Patterns guide treats entity, aggregate, component, lineage, content-revision, graph-locator, key-claim, and event-occurrence identities as independently configurable patterns. It crosswalks those choices to the K/O/C/T/QP RDF and SPARQL patterns and specifies the future dal: identity-profile vocabulary boundary. The dal:IdentityProfile vocabulary is specified in ontology/persistence, and the compiler resolves it per resource role (persistence-compiler-iri-sync Slice 3, complete). The guide and ADR-A82 were revised on 2026-09-23 by iri-patterns-post-3866b21-remediation and await ratification (P0.1.3). iri-policy.md is now a short historical record.


7. Surface Projection and MORK Unified Compiler (Phases 0–10)

Field Value
Status ✅ Phases 0–8 complete; Phases 9–10 planned
Unit ID surface-mork-unified-projection (Epic)
Sketch surface-projection.md
Plan surface-mork-unified-projection-plan.md
Status Records surface-mork-unified-projection.md, surface-outstanding-items.md
Implementation tools/surface/ (compiler), tools/mork_compilers/ (backends), ontology/surface/ (vocabulary + shapes + examples)
ADRs A16–A28 (13 decisions covering projection, lowering, governance, compilers, parity, conformance, invalidation)
Tests 61/61 Surface tests; 15/15 MORK backend tests; 346/346 LLM/MTP tests

Phase Completion Status

Phase Scope Status Tests Key Document
0 Vocabulary and layer semantics ✅ Complete ontology conforms Status §0
1 Projection, promotion, index contracts ✅ Complete all validate Status §1
2 Surface compiler architecture ✅ Complete 61/61 Status §2
3 Surface-to-MORK lowering ✅ Complete 61/61 Status §3
4 MORK governance and versioning ✅ Complete governance shapes Status §4
5 MORK compiler backends ✅ Complete 15/15 (SPARQL, SHACL, SWRL, Eligibility IR) Status §5
6 LLM training curriculum generation ✅ Complete 346/346 Status §6
7 Invalidation and minimal-scope regeneration ✅ Complete 60+ invalidation tests Status §7
8 Conformance, parity, and CI gates ✅ Complete parity ≥99%; 7/8 verification items; 1 SWRL integration pending Status §8
9 Migration guides and phased rollout ⏳ Planned — Plan §9
10 Scale, performance, optimization ⏳ Planned — Plan §10

Key Findings

Completed Slices

Slice ID Deliverable Status Reference
surface-projection Design sketch + plan + status ✅ Status §§1–2
surface-to-mork-lowering Lowering engine (Phase 3) ✅ Plan §3
mork-governance-and-versioning Foundation integration (Phase 4) ✅ Plan §4
mork-compiler-family All backends (Phase 5) ✅ Plan §5
surface-invalidation-and-regeneration Read-set tracking (Phase 7) ✅ Plan §7
surface-conformance-and-parity CI gates (Phase 8) ✅ Plan §8

Operational Documentation

Outstanding Items

| Item | Status | Link | |——|——–|——| | Signature scope and law X6 | ✅ Closed | Outstanding items §3.1 | | Foundation migration (srf:DerivedArtefact) | ✅ Done (ADR-A92) | Outstanding items §3.2 | | Profile identity assertion | ⏳ Blocked | Outstanding items §3.3 | | MORK toolchain join assumptions | ⏳ Needed | Outstanding items §3.4 |

Deferred Items (Explicit Scoping)

Blockers


8. Housekeeping First Cut

Field Value
Status 🚧 Slice 3 of RDF patterns; scoped, not started
Unit ID platform-housekeeping
Slice Part 2, Slice 3 of rdf-sparql-patterns-phase-plan.md
ADR ADR-A80
Depends On tools/persistence compiler (Slice 2) ✅

Deliverables (planned)

Blockers


Vocabulary Scoped and Temporal Binding — Closed (2026-09-25)

Field Value
Status ✅ Closed. Vocabulary suite, Surface, and Eligibility consumers all verified green. ADR-A85 Accepted
Unit ID vocabulary-temporal-binding
Trigger 65ac4a85e11cc1f8616e3e0c24efd59bf4ca410d ([vocabulary] time-bound binding)
Sketch vocabulary-temporal-binding.md
Plan vocabulary-temporal-fixes.md
Status Record vocabulary-temporal-binding.md
Validation Pack vocabulary-temporal-binding.md
ADR ADR-A85, Accepted

The conformance package (12 fixtures, populated Vocabulary SHACL files, a deterministic reference resolver) is authored and verified: mise run check:vocabulary passes 14/14. Both real consumers now resolve scoped bindings instead of reading voc:boundScheme directly: Surface’s compiler calls the resolver in enumerate_population, and Eligibility’s HierarchyWellFoundednessShape checks every scheme a contract could resolve to. python -m unittest surface.test_surface -q passes 62/62 (including a new scoped-binding fixture and test), and mise run check:python-root passes 77/77 plus Phase 8 conformance. See the status record for exact findings.

Slices

  1. ADR-A85, architecture mirror, fixture and traceability skeleton — done
  2. Examples plus structural and SHACL-SPARQL validation — done, verified
  3. Reference resolver and deterministic test suite — done, verified
  4. Consumer/provenance checks and documentation close-out — done, verified (Surface and Eligibility both resolve scoped bindings)

Closure cross-reference (2026-09-25)

A cross-reference of this unit’s Surface/Eligibility integration against docs/architecture/rdf-sparql-patterns-guide.md found the work internally consistent, with four follow-on hardening items and one accepted terminology note. None block closure. See Vocabulary Consumer Hardening below.

8.5 Vocabulary Conformance — Closed

See the unit record above. This heading is intentionally a navigation anchor between active platform work and archived material.


Ontology Semantic Versioning — Implemented, ADR pending ratification (2026-09-25)

Field Value
Status ✅ Slices 1-4 implemented (human directed autonomous implementation, 2026-09-25). ADR-A86 remains Proposed pending ratification
Unit ID ontology-semantic-versioning
Trigger Human request, 2026-09-25 — adopt SemVer 2.0.0 for ontology documents
Sketch ontology-semantic-versioning.md
Plan ontology-semantic-versioning.md
Status Record ontology-semantic-versioning.md
Policy ontology-versioning-policy.md
ADR ADR-A86, Proposed

Every owl:Ontology document under ontology/ carried an ungoverned owl:versionIRI, or none, with no documented rule for when it changed. The sketch’s inventory found four distinct problems: no bump rule beyond one ad hoc note in vocabulary/README.md; an already-inconsistent versioning unit (spec/*.ttl vs vocab/*.ttl independently versioned and already drifted); two ontologies (MORK, SPC) with no version identity at all; and one (applied/insurance/contract.ttl) with two disagreeing version signals and a namespace base outside the lattice/ tree. ADR-A86 adopted SemVer 2.0.0 per owl:Ontology document, a MAJOR/MINOR/PATCH mapping table, a one-time baseline reset to 0.2.0, and a narrow “changed but not bumped” check.

Slices

  1. ADR-A86, sketch, plan, status record, ADR-index and INDEX.md entries — done
  2. Developer/agent guidance (ontology-versioning-policy.md + CONTRIBUTING.md/ontology-architecture.md cross-references) — done
  3. Baseline reset (every in-scope document to 0.2.0, lattice/ base-URI normalisation, full owl:imports cascade, one discovered non-ontology importer fixed: tools/surface’s SURFACE_ONTOLOGY constant) — done, with one recorded deviation (README⇄spec extraction was not re-run; see status record)
  4. Narrow “changed but not bumped” enforcement tooling (tools/ontology_version_check.py, mise run check:ontology-versioning) — done, validated by mutation probe

Discovered while implementing, not yet acted on: tools/literate_extract.py --check does not currently pass for any of the seven core literate-spec layers (pre-existing README⇄spec drift, unrelated to this unit). Recorded in the policy document as a candidate future remediation unit.

8.6 Ontology Semantic Versioning — Implemented, ADR pending ratification

See the unit record above. This heading is intentionally a navigation anchor between active platform work and archived material.

Vocabulary Consumer Hardening — Implemented (2026-09-25)

Field Value
Status ✅ All 4 findings implemented (human directed “proceed with the attached plan”, 2026-09-25). Not yet executed in this sandbox (no rdflib) — authored and statically verified, hand-off for mise run check:vocabulary / python -m unittest surface.test_surface
Unit ID temporal-binding-consumer-hardening
Trigger Cross-reference of vocabulary-temporal-binding’s Surface/Eligibility integration against rdf-sparql-patterns-guide.md
Plan temporal-binding-consumer-hardening.md
Status Record temporal-binding-consumer-hardening.md

Four items carried forward from the vocabulary-temporal-binding closure review, all implemented:

  1. Finding 3 (docs). vvp:resolvedAt clarified as a valid-time “as-of” point, not a transaction-time “recorded when” timestamp, in ontology/vocabulary/shapes/constraints.ttl, tools/vocabulary/README.md, and the validation pack.
  2. Finding 4 (test). tools/vocabulary/tests/test_architecture.py: no module under tools/vocabulary/src/vocabulary/ may call a wall-clock function, mirroring tools/persistence. Mutation-probed in this session (fails when a datetime.now() call is introduced, passes otherwise).
  3. Finding 1, Option B (compiler + CLI + law text). tools/surface’s CLI (command_compile/command_check/command_parity/command_mork) now refuses to default produced_at to wall-clock time for any contract whose population could resolve a caller-scoped voc:SchemeBinding (contracts_needing_explicit_resolution_time in cli.py); srf:R1’s law text and compile.py’s module docstring updated to state the determinism guarantee precisely. The parity command’s --shared-corpus path is not guarded (deliberate non-coverage; no scoped fixture is in that corpus today).
  4. Finding 2 (ontology + compiler + manifest). New srf:resolvedAt, srf:resolvedBindingScope, srf:resolvedBinding, srf:resolvedViaFallback on srf:ReadSetEntry, populated on every BoundSchemeSource entry via a vocabulary.Resolution object now threaded through enumerate_population instead of discarded; a new srf:BoundSchemeSourceResolutionRecordedShape SHACL-SPARQL check; new tests proving the recorded trace changes when the caller’s context does.

Finding 5 (terminology overload of “scope”) remains accepted, no action.

Applied Ontology Readiness — all slices implemented (2026-09-25)

Field Value
Status 🚧 AOR-2 to AOR-9, AOR-3b, AOR-12, AOR-13 committed. AOR-10, AOR-11, AOR-14 to AOR-17 implemented and self-validated, awaiting the human’s commands
Unit ID applied-ontology-readiness
Trigger Human request, 2026-09-25 — close the gaps an applied (domain) ontology meets when built on LATTICE
Sketch applied-ontology-readiness.md
Plan applied-ontology-readiness.md
Status Record applied-ontology-readiness.md
Review applied-ontology-readiness-review.md
ADRs A-87, A-88, A-89, A-90, A-91, A-92, A-93 to A-96, A-83 and the A-86 addendum, all Accepted

Thirteen gaps (AO1 to AO13) that any applied ontology meets: Eligibility examples that warn or violate since 9a12da4, no reproducible way to load LATTICE’s import closure, versioning guarantees not enforced in CI, compilers limited to interval conditions and to candidates held on questions, no OWL backend for design-time checks, provenance not aligned with PROV-O, and four substrate extensions (derived rates, calendar binding, per-unit alternative bounds, one obligation in several provisions).

Slices

  1. Phase A, consumable baseline: AOR-1 governance records — done. AOR-2 examples and the declaration warning, AOR-3 versioning guarantees, AOR-4 import catalog — implemented, VPs
  2. Phase B, executable coverage: AOR-5 to AOR-9 (concept conditions, hierarchical match, SHACL and SWRL, diagnostics, profile aggregation, conformance corpus, evidence bindings) — implemented. AOR-10 and AOR-11 (OWL backend and its checks) — implemented, VP
  3. Phase C, substrate extensions: AOR-12 (Foundation derived-artefact contract) and AOR-13 (Executable to PROV-O) — implemented. AOR-14 to AOR-16 (one Quantification change) and AOR-17 — implemented, VPs

Documentation Link Repair — Pending (2026-09-25)

Field Value
Status ⏳ Pending. Not started
Unit ID documentation-link-repair
Plan documentation-link-repair.md
Status Record documentation-link-repair.md

mise run topology:links reports 419 broken links (340 distinct). 290 are in the ignored Jekyll output docs/_site/, which the checker should not scan. The other 50 are wrong relative depths, moved targets, and targets that no longer exist. Five slices, about 180k tokens.

8.7 Applied Insurance Reference (Epic) — Proposed

Field Value
Status 🚧 Round 1 complete: AIR-3.1, AIR-1.1 and AIR-2.1 merged. Round 2 next (AIR-3.2, AIR-1.2). Phase 0 complete, AIR-0.1 merged (3377a71), A-98, A-99, A-100, A-102, A-103 Accepted. Review, VP
Unit ID applied-insurance-reference (epic)
Sketches peril-vocabulary.md, asset-exposure-ontology.md, term-parameters.md, mork-bridge.md, peril-structure-whitepaper.md
Plan applied-insurance-reference.md, with phase plans 0 to 6, a substrate track, and lanes and merge order
Status Record applied-insurance-reference.md
ADRs A-98 (with addendum), A-99, A-100, A-102, A-103 Accepted. A-101 reserved for Phase 5

Reference implementation of the applied insurance domain: module split, reference peril vocabulary, Eligibility over flat lists and several values with reviewed crosswalks for flat or taxonomic peril lists, exposure ontology, term parameters with derived liability direction, and optional compilation into Capacity. Seven substrate items (L-P1 to L-P5, spatial guidance, evidence resolution) run as a non-blocking track.

Part III — Archived/Historical Work

8. Phase Handoff Documents (0-6)

Phase Status Record Key Outcome
Phase 0-1 phase-0-1-handoff.md 🗄️ Archived; refer to individual status docs
Phase 2 phase-2-handoff.md 🗄️ Archived
Phase 3 phase-3-handoff.md 🗄️ Archived
Phase 4 phase-4-handoff.md 🗄️ Archived
Phase 5 phase-5-handoff.md 🗄️ Archived
Phase 6 phase-6-handoff.md 🗄️ Archived

Reference: platform-continuation.md describes current platform state post-Phase-6.


9. Other Completed Units

Unit Status Link
MORK Package Split ✅ Complete mork-package-split.md
SPC Package Split ✅ Complete spc-package-split.md
Ontology Root Relocation ✅ Complete ontology-root-relocation.md
Validation Pause Handover ✅ Complete validation-pause-handover.md
Validation Status ✅ Track record validation-status.md
Implementation Handover (Phases 0-6) 🗄️ Archived implementation-handover-historical.md
Design Sketches (earlier batch) ✅ Catalogued DESIGN_SKETCHES_INDEX.md and design-sketches-validation-summary.md

Part IV — How to Navigate This Index

By Topic

Surface Projection and MORK Compiler

RDF/SPARQL & Persistence

Vocabulary Binding

Ontology Semantic Versioning

Applied Ontology Readiness

MTP & LLM Training

Architecture Decisions

Sketches & Plans

Validation Packs

By Phase

By Status

✅ Complete (Ready for Handoff or Integration)

  1. RDF/SPARQL patterns guide (Slice 1)
  2. Persistence compiler (Slice 2) — 774 tests passing after persistence-compiler-iri-sync’s Slices 1–5 (complete, human-validated 2026-09-25); that unit’s Slice 6 (documentation close-out) is its own final pass
  3. LLM training / MTP generation — 346 tests passing
  4. Repository topology (ADR-A77)
  5. MORK eligibility compiler (awaiting runtime validation, not handoff)
  6. Surface Projection Phases 0–8 — 61/61 Surface tests, 15/15 MORK backends, 7/8 verification items
  7. Phase 0-6 handoff documents

🚧 In Progress

  1. Epic decomposition (Phase 0-9 plans)
  2. Persistence compiler / IRI-patterns sync (persistence-compiler-iri-sync) — Slices 1–5 of 6 done (774/774 passing, human-validated); Slice 6 (documentation close-out) in progress
  3. Housekeeping first cut (Slice 3, scoped but not started)
  4. Surface MORK Phase 8 verification (SWRL reasoner integration, 1/8 items pending)

⏳ Planned

  1. Housekeeping execution (tied to future store SPI)
  2. Governance surfaces backend integration (Phase 2/5)
  3. Phase 0-9 implementation
  4. Surface MORK Phase 9 — Migration guides and phased rollout
  5. Surface MORK Phase 10 — Scale and performance optimization
  6. Vocabulary scoped and temporal binding conformance — closed 2026-09-25
  7. Vocabulary consumer hardening (temporal-binding-consumer-hardening) — implemented, not yet executed in this sandbox
  8. Ontology semantic versioning (ADR-A86) — implemented, ADR accepted 2026-09-25
  9. Applied ontology readiness (applied-ontology-readiness) — AOR-2 to AOR-9, AOR-3b, AOR-12/13 committed, the rest implemented, review requested
  10. Documentation link repair (documentation-link-repair) — pending

🗄️ Archived

  1. Phase 0-6 handoff documents (refer to individual status records)
  2. Implementation handover from earlier phases

Part V — Key Decision Points (Awaiting Ratification or Decomposition)

Item What Why Next
Epic decomposition Break lattice-platform-agentic-development-v0.2.md into Phase 0-9 plans Required Phase 2 (P2.1/P2.3/P2.4) revision and the optional Phase 0.2-0.4 coherence note are both complete (2026-09-22) Begin Phase 0 decomposition
Surface MORK Phase 8 verification SWRL rule load into OWL reasoner (final verification item) 7/8 verification items complete; SWRL backend generates rules but integration needed Resolve before Phase 9 sign-off
Surface MORK Phase 9 decomposition Break migration and phased rollout into slices Phase 8 complete (except SWRL integration); Phase 9 is planned but not decomposed Decompose after Phase 8 verification complete
Housekeeping first cut (Slice 3) Scaffold platform/housekeeping module Compiler ready; module contracts defined in ADR-A80; job duties extended by the 2026-09-23 guide remediation Author Slice 3 (housekeeping scaffolding)
Store SPI Design runtime SPI for query execution Compiler produces templates; runtime binding TBD Separate epic/phase after housekeeping
MTP backend integration (Phase 7) Runtime API for LLM curriculum delivery MTP generation complete; needs HTTP endpoint Post-Phase-6 work
Vocabulary temporal binding conformance Examples, SHACL, resolver, consumer provenance checks Closed 2026-09-25: executed and verified, ADR-A85 Accepted None. Follow-on hardening tracked as temporal-binding-consumer-hardening
Vocabulary consumer hardening produced_at/hash conflation, missing resolution trace, vvp:resolvedAt naming, vocabulary architecture test Implemented 2026-09-25 (all 4 findings); not yet executed in this sandbox (no rdflib) Run mise run check:vocabulary and python -m unittest surface.test_surface -v, then close out
Ontology semantic versioning ADR-A86, versioning-policy doc, baseline reset, narrow enforcement check Implemented (2026-09-25): policy doc, 0.2.0 baseline reset across 29 ontology documents, check:ontology-versioning tooling Decide whether the discovered literate_extract.py drift becomes its own unit
Applied ontology readiness ADRs A-83, A-86 addendum, A-87 to A-96, 17 slices in three phases Gaps any applied ontology meets when built on LATTICE (loading, examples, compilation, provenance, substrate extensions) Run the review’s commands, record sign-off in LOG.md
Applied insurance reference Epic: applied insurance module split, peril vocabulary, Eligibility readings and crosswalks, exposure, term parameters Sketches consolidated into an epic, 2026-09-26. Legacy contract module dropped, new one deferred until Open CBAA integration Round 0 of the lanes plan: create branches 1.1, 2.1 and 3.1 on the runtime machine

Part VI — Traceability and Validation

Validation Packs (VPACKS)

Test Taxonomy (L0–L8)

Test Coverage Status

| Unit | Tests | Command | |——|——-|———| | Surface compiler | 61 passing | pytest tools/surface/src/surface/test_surface.py -v | | MORK compiler backends | 74 passing (2026-09-25) | mise run check:mork-compilers | | LLM/MTP | 346 passing | mise run check:mtp | | Persistence compiler | 774 passing (confirmed 2026-09-25, after Slice 5) | mise run check:persistence | | Ontology tools (catalog, versioning, Eligibility examples, PROV-O alignment) | 35 passing | mise run check:ontology-catalog | | Ontology versioning | tool run | mise run check:ontology-versioning |


Part VII — Open Questions (Blocking or Deferred)

  1. Store SPI design — How does runtime connect compiled templates to live backend? (Deferred to separate SPI phase. The caller contract it must honour is now documented in tools/persistence/README.md, “Using the generated SPARQL directly”)
  2. Phase 0.2–0.4 walking-skeleton pattern integration — done (2026-09-22): Part 4 of the epic plan carries the Pattern C/T/K/O ↔ dal: cross-references, new slice P0.3.9, and guardrail G11. See Part II, §6 and Part V.
  3. MTP backend integration — What HTTP API shape for LLM curriculum consumption? (Phase 7, post-Phase-6)
  4. Housekeeping execution — When is the housekeeping component itself executed (real-time vs. batch)? (ADR-A80 defers to future phase)
  5. Surface MORK Phase 9 decomposition — How to slice migration guides and phased rollout? (Blocking Phase 9, needs decomposition after Phase 8 SWRL verification)
  6. Foundation migration for srf:DerivedArtefact — resolved 2026-09-25 by ADR-A92 (AOR-12). Original question: Should profile identity be a Foundation concept or Surface-only? (Blocking profile identity assertion in Surface; see surface-outstanding-items.md). Proposed resolution: ADR-A92
  7. MORK toolchain join assumptions — Pre-production verification checklist for join operations in mapping compilation (see surface-outstanding-items.md)

Document Maintenance

This index is updated when:

Last updated: 2026-09-25 — persistence-compiler-iri-sync Slices 4 and 5 human-validated (774/774 passing); Slice 6 documentation close-out in progress Last reviewed: 2026-09-22
Next review: Upon Phase 8 SWRL verification completion and Phase 9 decomposition